Notice: Road Closure

September 11, 2020

Dear Resident

Re: Pump Station Maintenance

The Township of Edwardsburgh/Cardinal has contracted Selleck Mechanical to replace valves and pipework in our sewage pumping station located adjacent the south corner of Drummonds Gas Bar property on Tuesday, September 15th. During this work, sewage will be diverted to trucks on Water St. to enable work inside the wet well. For added safety and to allow free movement of the vacuum trucks, South St. from Irving to Water St. will be closed except for local and emergency traffic. There will be no exit from Water St. to Spencer as the intersection will be closed. We ask that all residents avoid the Water St. area where possible to allow the work to commence safely and without interruption.

The Vacuum truck used for the bypassing is loud and residents may experience extended periods of noise. The expected duration to complete the work is 8-12hrs. We apologise for any inconvenience and thank you for your patience and understanding.

Below is a copy of the traffic control plan map for your reference.

If you have any questions or concerns, please don’t hesitate to contact me at 613-657-3765.

Sincerely,

Eric Wemerman
Chief Water/Waste Water Operator
Edwardsburgh/Cardinal

Categorized in:

Comments are closed here.